其他分享
首页 > 其他分享> > Pset_ProjectOrderMaintenanceWorkOrder

Pset_ProjectOrderMaintenanceWorkOrder

作者:互联网

Pset_ProjectOrderMaintenanceWorkOrder

项目订单维护工作订单:维护工作订单是对要执行的维护工作的详细描述。请注意,当需要维护工单作为计划工单实例时,将使用维护工单的计划频率属性。

 

 

NameTypeDescription
ProductDescription P_SINGLEVALUE / IfcText
Product Description A textual description of the products that require the work.
WorkTypeRequested P_SINGLEVALUE / IfcText
Work Type Requested Work type requested in circumstances where there are categorizations of types of work task. It could be used to identify a remedial task, minor work task, electrical task etc.
ContractualType P_SINGLEVALUE / IfcText
Contractual Type The contractual type of the work.
IfNotAccomplished P_SINGLEVALUE / IfcText
If Not Accomplished Comments if the job is not accomplished.
MaintenaceType P_ENUMERATEDVALUE / IfcLabel / PEnum_MaintenanceType
Maintenace Type Identifies the predefined types of maintenance that can be done from which the type that generates the maintenance work order may be set where: ConditionBased: generated as a result of the condition of an asset or artefact being less than a determined value. Corrective: generated as a result of an immediate and urgent need for maintenance action. PlannedCorrective: generated as a result of immediate corrective action being needed but with sufficient time available for the work order to be included in maintenance planning. Scheduled: generated as a result of a fixed, periodic maintenance requirement.
FaultPriorityType P_ENUMERATEDVALUE / IfcLabel / PEnum_PriorityType
Fault Priority Type Identifies the predefined types of priority that can be assigned from which the type may be set where: High: action is required urgently. Medium: action can occur within a reasonable period of time. Low: action can occur when convenient.
LocationPriorityType P_ENUMERATEDVALUE / IfcLabel / PEnum_PriorityType
Location Priority Type Identifies the predefined types of priority that can be assigned from which the type may be set where: High: action is required urgently. Medium: action can occur within a reasonable period of time. Low: action can occur when convenient.
ScheduledFrequency P_SINGLEVALUE / IfcTimeMeasure
Scheduled Frequency The period of time between expected instantiations of a work order that may have been predefined.

 

 

 

 

##############################

标签:type,SINGLEVALUE,work,Pset,maintenance,ProjectOrderMaintenanceWorkOrder,action,T
来源: https://www.cnblogs.com/herd/p/15778387.html